计算现浇混凝土楼梯工程量时,正确的做法是(  )。

计算现浇混凝土楼梯工程量时,正确的做法是(  )。A.以斜面积计算 B.扣除宽度小于500mm的楼梯井 C.伸入墙内部分不另增加 D.整体楼梯不包括连接梁

查看答案

设备基础挖土方,设备混凝土垫层为5m×5m的正方形建筑面积,每边需工作面0.3m,挖土深度1m,其挖方量是(  )m3。

设备基础挖土方,设备混凝土垫层为5m×5m的正方形建筑面积,每边需工作面0.3m,挖土深度1m,其挖方量是(  )m3。A.18.63 B.25 C.20.28