题目内容:
The cost of construction as _______ as the construction period has already increased twofold over previous estimates.
(A)good (B)well (C)fine (D)far
参考答案:
The cost of construction as _______ as the construction period has already increased twofold over previous estimates.
(A)good (B)well (C)fine (D)far