单选题:During which phase of a project is the level of uncertainty

  • 题目分类:PMP
  • 题目类型:单选题
  • 查看权限:VIP
题目内容:
During which phase of a project is the level of uncertainty the greatest? ( )
A.Design
B.Development/Execution
C.Conceptual
D.Phase-out A.设计
B.开发/实行
C.构思立项
D.结束
参考答案:
答案解析:

1/210+1/211+1/212的值为(  )。

1/210+1/211+1/212的值为(  )。A.1/213 B.3/4×1/210 C.5/4×1/210 D.7/4×1/210

查看答案

Using the figure below, what is the probability that project

Using the figure below, what is the probability that project1 will be selected a

查看答案

Under which of the following conditions will a contract not

Under which of the following conditions will a contract not be regarded as a leg

查看答案

Read the following advertisement for sales manager.VACANCYA

Read the following advertisement for sales manager.VACANCYA leading internatio

查看答案

商业设计也许越来越被赋予艺术创作和欣赏的价值,但它根本的出发点和落脚点永远是把产品的特质用艺术的方式展现给顾客。如果一项

商业设计也许越来越被赋予艺术创作和欣赏的价值,但它根本的出发点和落脚点永远是把产品的特质用艺术的方式展现给顾客。如果一项商业设计不能让人联想到产品并对之产生好感

查看答案